Jan 22, 2014 13:49
10 yrs ago
22 viewers *
Arabic term

أوامر التغيير الصافية المعتمدة

Arabic to English Tech/Engineering Construction / Civil Engineering engineering, construction, contracts
قيمة اوامر التغيير الصافية المعتمدة :
قيمة العقد النهائية بعد أوامر التغيير :
خصم 0% من قيمة المستخلص مقابل الدفعة المقدمة :
نسبة الإنجاز الفعلية حتى تاريخه :
نسبة الإنجاز حسب المستخلصات المقدمة :

Proposed translations

3 days 8 hrs
Selected

net value of approved variation orders

Something went wrong...
4 KudoZ points awarded for this answer. Comment: "thanks"
11 mins

net approved variation order value

A variation order is a 'change' which the Architect may be issued to make to the drawings, such as putting in a new window. The Architect will then inform the builders of the variation.
Something went wrong...
8 hrs

valuation of authorized or permissible variation works

Variation is alteration in the form of addition, substitution, or omission from the original scope of the contracted works.
Variations may be valued by: A variation quotation prepared by the contractor and accepted by the client.
Something went wrong...
3 days 4 hrs

approved orders of pure modification

Value of approved.. pure.mere modification
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search